Contact UsAbout UsDept. of Civil and Environmental Engineering
INE
CEM HOME ABOUT CEM RESEARCH DEPARTMENTS STUDENTS FACULTY & STAFF VISIT US


Civil & Environmental Engineering

CEE HOME
About
People
Research
Graduate
Undergraduate
News
Employment/Jobs
Contact
2007 Steel Bridge Competition
CEM Departments

Civil & Environmental Engineering
Electrical & Computer Engineering
Engineering and Science Management
Geological Engineering
Mechanical Engineering
Mining Engineering
Petroleum Engineering
Login >
Engineering and Science Management

Typical ESM Graduate Projects

University of Alaska Fairbanks--Engineering Science Management Student Projects

The following is a partial list of projects completed in the recent past by UAF students in fulfillment of the requirements for ESM 684-ESM Project.

  • A Data Collection & Analysis System for Houses Built on Permafrost
  • A Distributed Data Processing Implementation Strategy for the Chatham Area, Tongass National Forest
  • A Linear Programming Method for the Optimal Assignment of United States Air Force KC-135 Tanker Aircraft to Forward Operating Locations
  • A Management Control System for Remote Regions Projects: An ILS Model Network, Logistics Information System and Support Information Package for Use by the Polar Ice Coring Office
  • A Project Plan For The Galbraith Lake Campground
  • A Reevaluation of Alaska Policy Prohibiting the Use of Explosives in the Marine Environment: A consideration of whether explosives should be allowed in the transition zone
  • A Time Management Analysis of the City of Fairbanks Engineering Division
  • A Total Quality Management Approach to the Reduction of Outage Durations at an Electric Utility
  • A Traffic Flow Analysis of the Eielson Air Force Base: Base Exchange/Commissary Mall Parking Lot
  • A Waiting Line Study of a Multi-Channel Bank Drive-Up System
  • A Feasibility Study for Medical Electronic Service
  • Achieving Quality Architectural/Engineering Services Through Quality Management
  • Alaska Construction Contract Law
  • Alaska Pavement Inventory Used in a Priority Programming System
  • Alaskan Placer Mining Reclamation, Tasks and Costing Analysis
  • Allocating Alaska's Limited Resources: The Need for a Quantified Decision Method for University of Alaska Capital Project Planning
  • Alternative Methods of Financing Public Works
  • An Analysis of Supplying Natural Gas to Fairbanks
  • An Application of Project Management: Developing a Forecast System
  • An Economic Analysis of the Small Unit Support Vehicle
  • An Economic Feasibility Study of Export of Beneficiated Coal from Usibelli Coal Mine to Korea
  • An Evaluation of Traffic Simulation for Analyzing Routing Alternatives
  • An Inquiry into the Development and Preparation of Construction Contract Documents and Procedures
  • An Investigation into the use of a Thermostatic Control Device to Control Auxiliary Heating Equipment on Vehicles
  • ANWR's National Petroleum Reserve: Explore It Before Locking The Door
  • Business Planning for Design Firms
  • Computer Simulation of Battery Production Operations for Analyzing Process Alternatives
  • Computer Software Reliability Management (from a digital hardware perspective).
  • Computerized Control Algorithms for Mixed Air Control of Commercial Buildings Air Handling Equipment
  • Correction of Axle Undercounting in Pneumatic Tube Traffic Surveys: A Simulation Approach
  • Cost Analysis of Hazardous Waste Incineration in Alaska.
  • Crisis Management - A Future Management Technique for Engineers
  • Critical Path Management in the Alaskan Construction Industry
  • Development and Implementation of Computer-Assisted Job Costing Systems
  • Differing Site Condition Clauses - A Comparison of Clauses Used By Various Public and Private Agencies
  • Economic Analysis of the Active Solar Heating Alternatives in Alaskan New Home Construction
  • Economic Life of Trans Alaska Pipeline System
  • Eielson AFB General Plan and GIS Implementation Plan
  • Electric Utility Industry Regulation and Regulatory Reform
  • Emergency Building Egress for the Mobility Impaired
  • Engineering and Economics Analysis
  • Environmental Mitigation and Regulation Compliance on the Trans-Alaska Pipeline
  • Evaluation of Feasibility and Economic Viability of Multiple Step Upgrade of Interior Alaska Hardwoods
  • Experimental Simulation for Project Management
  • Exploring and Implementing Job Order Contracting
  • Facility Records Management
  • Feasibility Analysis of an Alpine Ski Resort on Moose Mountain, Fairbanks, Alaska
  • Feasibility of Residential Photovoltaics in Alaska
  • Feasibility Study for Satellite Tracking Station at Fairbanks, Alaska, December 1994.
  • Fort Wainwright Radiation Safety Program Standard Operating Procedure and Implementation
  • Improving Pulp Mill Effluent: An Evaluation of the Costs and Benefits
  • Investigation of the Inventory System of a Sports Equipment Sales Store
  • Land Use Management and Planning Tool for Transportation Systems
  • Life Cycle Cost Bidding Legal Aspects, Methodology and Software - A Project for Alaska DOT&PF
  • Management Guidance for Quality Civil Engineering Operations
  • Managing High Potential Well Damages
  • Methodology Improvements in U.S. Army Test Procedures for Determining Insulative Properties of Clothing for Arctic Tests
  • Northern Operations Handbook for the Junior Military Engineer
  • Optimizing Moves For Renovation Projects At Remote Locations
  • Petroleum Development Laboratory, an EOR Research Center in Alaska
  • Project Controls: What is Really Used?
  • Project Jukebox: Using Modern Technology to Preserve Endangered Recordings
  • Project Management Approach: An Effective Project Team
  • Proposal for a UAF Field Safety Procedures Manual
  • Public Construction Claim Settlement Methodologies and Philosophies - Recommendations for Improvement
  • Rapid Deployment: An Exercise in Airframe Minimization
  • Rehabilitation of Pavements
  • Selection of Combustion Air Handling Equipment for Gas Turbine Installation in the Arctic Environment Using Life Cycle Costing Analysis
  • Technical Trade Between Alaska and the Soviet Union
  • The Archive Future of the Alaska Synthetic Aperture Radar Facility
  • The Barber Shop: An Analysis of Ft. Wainwright's Barber Shop using Queuing Theory to Predict the Optimum Time of Expansion
  • The Battle for North Norway and the A-10, May 1986.
  • The Cost of Quality Designs by Open-End Consultants for Air Force Facilities, May 1989.
  • The Development of the A-10 Flying Hour Program for Fiscal Year 1986
  • The Economic Feasibility of a Satellite Repair Company
  • The Feasibility of a Local Area Network (LAN) for the DOTY, Cobra Eye Training Flight, Office 24 SRS - Eielson AFB
  • The Feasibility of an Additional Ice Skating Facility in the Fairbanks North Star Borough
  • The Introduction of Micro-computers into Alaska Department of Transportation and Public Facilities Project Field Offices
  • Towards a Computer-Based Bibliography for Cold Weather Construction Managers
  • Traffic Control Plan, Procedures and Methodologies: South Cushman Street
  • Transitioning the Russian Space Program into the Commercial Launch Market
  • Two-year Construction Work Plan and the Rural Electrification Administration Loan Process
  • Valdez Solar Dome Softball Stadium, Conceptual Study
  • Water Quality and Gold Recovery Investigations at Gold Dust Mine, Circle Mining District, Alaska
  • What is the B-2 Really Worth?
  • Winter Highway Construction
  • Wolf-Moose Management in Alaska: A Scientific Approach

National Technological University Student Projects

The following is a partial list of projects completed in the recent past by National Technological University students in fulfillment of the requirements for ESM684/MB780-G-Capstone Project under the auspices of the UAF program:

  • 895 Printer Development and Customer Problem Resolution
  • A Client Server Network Simulation Model
  • A Customized Manufacturing Quote Method for Polybent Products
  • A Guide to the Computer Aided Design System Upgrade Procurement Process
  • A Plan for an Ashland Electrical Power Distribution Study
  • A Project Management System for Gallium Arsenic Application Specific Integrated Circuits
  • Accelerating the Product Development Cycle
  • Adaptation of Large Project Management Procedures for Small Projects
  • Addressing the Need for Growth Transmission Line Testing in the Cellular Communications Industry
  • Addressing the Software Crisis using Object-Oriented Technology
  • An Engineering Management Analysis of the Trident II MK6 Guidance System Program
  • An Engineering Study for Modernization of a Five Stand Tandem Cold Mill
  • Bare Copper Printed Circuit Board Processes (Development and Introduction Within Digital
  • Blackbird Application Development Process
  • Budget, Staffing and Equipment Needs for the Sensitometric Testing of Graphic Films in Kodak Park
  • Capacity Planning system: Machine Placement Analysis
  • Capital Budgeting of Cross-Connect Systems and Their Economically Optimized Deployment in a Communications Network
  • Client/Server Database application Development Accelerators: Fact or Fiction?
  • Customizing the Installation of CQI Techniques to Existing Organizations
  • Design Management
  • Designing Products for Maintainability
  • Development of a Mold Management Systems
  • Development of a Quality Plan for a Writable CD Production Station
  • The Development of a Total Quality Management System for a Semi-Conductor Failure Analysis Operation
  • Economic Application of Software Quality Assurance Methods to Small Computing Projects
  • The Effect of Career plateauing on Motivation in the Engineering Environment
  • Emerging Technology Forecast and Assessment: U.S. Digital Cellular Technology
  • Engineering Management 2000: How the Trends of the 1990�s will Change the Role of the Engineering Manager in the 21st Century
  • Equipment Reliability Program in the Plant Maintenance Division
  • Establishing a Predictive Maintenance Program in a Manufacturing Facility
  • Evaluation of the Development and Implementation of a New Engineering Organization
  • Feasibility Study of a Second AJAC Enduferator Production Plant
  • Feasibility Study of Recycling at Milliken Chemical Dewey Plant
  • Financial Forecasting using Neural Networks
  • Guesstimating to Estimating: Predictive Costing at the Concept Stage of Product Development
  • Increasing Productivity of a Copier Service Business Utilizing The Field Data Available
  • Information Systems Planning in a Cost Plus, Government Owned, Contractor Operated Environment
  • International Procurement
  • Inventory Analysis for Heluva Good Cheese Inc. Horseradish Division
  • LAMANNA, GINA M., Improved Methods of Web Cleaning: Analysis of Cost and Benefit, Spring 1994.
  • Lighting and Exhaust System Energy Reduction
  • The Management of Software Releases in a Networked Manufacturing Environment Motivating Industrial Staff in an Internal Supplier Facility: A Case Study of the Plastics Business Center of Xerox Corporation
  • Motivational Techniques for Technical Professionals
  • Plan for Qualification of Laser Diode for Use in Optical Storage Device
  • Practical Quantitative Methods for Software Development Process Management
  • Predicting Cost of New Equipment from a Design Concept.
  • Predicting the Costs and Benefits of Designing Computer Products for Mixed Model Production
  • Project Management Simulator: Upgrade and Support of Heterogeneous Computer Platforms
  • Quality Management, A Process Approach
  • Reducing Schedule Slip in Product Development Projects to Increase Revenues
  • Short Case Names Fabrication: A Case Study of Project Management Techniques
  • Software Globalization: Opportunity or Necessity
  • Software Project Communication Guidelines: Interface between Marketing and Development
  • Statistical Process Control in a Professional Facilities Engineering Organization
  • Strategic Sourcing: A Make or Buy .Tool for Competitive Manufacturers
  • Strategy Support Systems: The Integration of Computer and Strategy Development Through Implementation
  • Survival of Service Support Organization In a Large Manufacturing Company in Today�s Competitive Environment
  • Telecommunications Interoperability in the Post Divestiture Era
  • Three Powerful Engineering Management Tools for Efficient Engineering Project Management in an R&D Environment of a High-Tech Firm: ICAF, WBS, and CPM.
  • TQM Implementation and People Involvement Process in HVIC
  • Using Statistical Analysis of Forecast Error to Reduce Safety Stock Inventories

To the ESM Home Page

Last modified 2007-03-12 by OIT Web Developer. | UAF is an affirmative action/equal opportunity employer and educational institution